▶️ Video: Line rebuild pole pick up

A ground crew from Altitude Energy hooks a new electric pole to be lifted and flown by a helicopter to an area down the canyon inaccessible by truck. The pole set is part of an SDCEA project in Chaffee and Lake counties to rebuild line from the Buena Vista substation to the Twin Lakes substation.